The water systems Florida's own documents tie to PFAS funding: what each project is, the amount the state printed, how far it has got, and the document that says so. Latest record Aug 12, 2026; page updated Nov 2, 2026.
Sources: Drinking Water State Revolving Fund Annual Report SFY2023-2024, BIL Emerging Contaminant C (2024-09-25); Drinking Water State Revolving Fund Annual Report SFY2024-2025, IIJA Emerging Contaminant (2025-09-26); Drinking Water State Revolving Fund Intended Use Plan for the FFY2025-2026 DWSRF Base Prog (2026-03-19); Drinking Water State Revolving Fund Intended Use Plan for the FFY2026-2027 DWSRF Base Prog (2026-06-18); Drinking Water State Revolving Fund Intended Use Plan for the FFY22 and FFY23 DWSRF Emergi (2024-05-08); Drinking Water State Revolving Fund Intended Use Plan for the FFY24 and FFY25 DWSRF Emergi (2026-08-07). Open funding rounds and rules for Florida →
| May 13, 2026 | Expansion of nanofiltration WTP from 10 MGD to 30 MGD and removal of PFAS On the DWSRF base/GS waiting list (below the funding line) | $114M | Source, p. 29 → |
| Aug 13, 2025 | Expansion of nanofiltration WTP from 10 MGD to 30 MGD and removal of PFAS On the adopted DWSRF base/GS fundable list (new segment), SFY2026-27 | $30M | Source, p. 27 → |
| Nov 8, 2023 | Project not described Planning/design agreement executed, SFY2024 | $9.6M | Source, p. 12 → |
| May 14, 2025 | Project not described Planning/design agreement executed, SFY2025 | $5.4M | Source, p. 13 → |
| Aug 14, 2024 | Evaluation for upgrading the existing treatment process with granular activated carbon (GAC), upgrading the existing process with anion exchange, decommissioning the existing treatment process and replace with a membrane process, and an alternative where the capacity at the West Water Treatment Plant (treatment is nanofiltration) is increased to replace the capacity at the East Water Treatment Plant. On the final EC fundable list, SFY2024-25 | $29k | Source, p. 28 → |
| May 8, 2024 | Evaluation for upgrading the existing treatment process with granular activated carbon (GAC), upgrading the existing process with anion exchange, decommissioning the existing treatment process and replace with a membrane process, and an alternative where the capacity at the West Water Treatment Plant (treatment is nanofiltration) is increased to replace the capacity at the East Water Treatment Plant. On the amended EC fundable list, SFY2023-24 | $204k | Source, p. 26 → |
| May 8, 2024 | Evaluation for upgrading the existing treatment process with granular activated carbon (GAC), upgrading the existing process with anion exchange, decommissioning the existing treatment process and replace with a membrane process, and an alternative where the capacity at the West Water Treatment Plant (treatment is nanofiltration) is increased to replace the capacity at the East Water Treatment Plant. On the EC waiting list (below the funding line), SFY2023-24 | $29k | Source, p. 28 → |
| Nov 8, 2023 | Evaluation for upgrading the existing treatment process with granular activated carbon (GAC), upgrading the existing process with anion exchange, decommissioning the existing treatment process and replace with a membrane process, and an alternative where the capacity at the West Water Treatment Plant (treatment is nanofiltration) is increased to replace the capacity at the East Water Treatment Plant. On the amended EC fundable list, SFY2023-24 | $5.17M | Source, p. 27 → |
| Apr 28, 2025 | Project not described Planning/design agreement executed, SFY2025 | $4.25M | Source, p. 13 → |
| Aug 14, 2024 | The City of Port Richey has detected PFOA+PFAS in raw water samples from Well 1 (20 ppt), Well 7 (19.6 ppt), Well 7A (18.7 ppt), Well 8 (39.4 ppt), and finished water samples at the point of entry (21 ppt) to the water distribution system. The City plans to evaluate ion-exchange, reverse osmosis, and GAC for the reduction of PFAS concentrations. On the final EC fundable list, SFY2024-25 | $4.25M | Source, p. 28 → |
| Mar 14, 2025 | Project not described Planning/design agreement executed, SFY2025 | $4.11M | Source, p. 13 → |
| Feb 27, 2025 | Project not described Planning/design agreement executed, SFY2025 | $3.57M | Source, p. 13 → |
| Aug 14, 2024 | The 3 water treatment effluent samples had PFAS at levels greater than 4 parts per trillion. As such, pilot studies and planning documents will include a cost-effective emerging contaminants treatment system evaluation, design, and construction by the 2029 deadline established in the NPDWR for six PFAS. On the final EC fundable list, SFY2024-25 | $3.57M | Source, p. 28 → |
| Jan 9, 2025 | Project not described Planning/design agreement executed, SFY2025 | $7.74M | Source, p. 13 → |
| Nov 8, 2023 | Evaluation ion-exchange, nanofiltration, reverse osmosis, and granular activated carbon for treatment of PFAS and design for upgrades for the Water Treatment Plant. On the amended EC fundable list, SFY2023-24 | $7.74M | Source, p. 26 → |
| Oct 21, 2024 | Project not described Planning/design agreement executed, SFY2025 | $533k | Source, p. 13 → |
| Nov 8, 2023 | Evaluate treatments through pilot studies with media specifically designed to target PFAS removal and foam fractionation. On the amended EC fundable list, SFY2023-24 | $533k | Source, p. 26 → |
| Jul 29, 2024 | Project not described Planning/design agreement executed, SFY2025 | $9.97M | Source, p. 13 → |
| Aug 9, 2023 | Planning and Design for the upgrades to WTP 2, 3, 8, and 9 to remove PFAS. On the amended EC fundable list, SFY2023-24 | $3.63M | Source, p. 26 → |
| Jun 11, 2024 | Project not described Planning/design agreement executed, SFY2024 | $100k | Source, p. 12 → |
| May 15, 2024 | Project not described Planning/design agreement executed, SFY2024 | $252k | Source, p. 12 → |
| Mar 20, 2024 | Project not described Planning/design agreement executed, SFY2024 | $10.5M | Source, p. 12 → |
| Nov 8, 2023 | Evaluation of the current water treatment process and design for Water Treatment Plant upgrades to treat PFAS in the raw water. On the amended EC fundable list, SFY2023-24 | $10.5M | Source, p. 26 → |
| Jan 18, 2024 | Project not described Planning/design agreement executed, SFY2024 | $3.1M | Source, p. 12 → |
| Aug 12, 2026 | Construction of an ultraviolet light advanced oxidation process (UV AOP) WTP with granular activated carbon (GAC) to remove per- and polyfluoroalkyl substances (PFAS), 1,4-dioxane, and total trihalomethanes (TTHM) from the drinking water supply Proposed EC increase on the draft list for the 8/12/2026 meeting, SFY2025-26 | $8k | Source, p. 30 → |
| Aug 12, 2026 | Construction of an ultraviolet light advanced oxidation process (UV AOP) WTP with granular activated carbon (GAC) to remove per- and polyfluoroalkyl substances (PFAS), 1,4-dioxane, and total trihalomethanes (TTHM) from the drinking water supply Proposed EC increase on the draft list for the 8/12/2026 meeting, SFY2025-26 | $188k | Source, p. 30 → |
| Aug 12, 2026 | Construction of an ultraviolet light advanced oxidation process (UV AOP) WTP with granular activated carbon (GAC) to remove per- and polyfluoroalkyl substances (PFAS), 1,4-dioxane, and total trihalomethanes (TTHM) from the drinking water supply On the draft EC waiting list (below the funding line), SFY2025-26 | $3.44M | Source, p. 31 → |
| Feb 15, 2025 | Construction of an ultraviolet light advanced oxidation process (UV AOP) WTP with granular activated carbon (GAC) to remove per- and polyfluoroalkyl substances (PFAS), 1,4-dioxane, and total trihalomethanes (TTHM) from the drinking water prior to distribution On the EC waiting list (below the funding line), SFY2024-25 | $31.2M | Source, p. 29 → |
| Feb 12, 2025 | Construction of an ultraviolet light advanced oxidation process (UV AOP) WTP with granular activated carbon (GAC) to remove per- and polyfluoroalkyl substances (PFAS), 1,4-dioxane, and total trihalomethanes (TTHM) from the drinking water prior to distribution. On the final EC fundable list, SFY2024-25 | $19.3M | Source, p. 28 → |
| Feb 12, 2025 | Main Water Treatment Plant Advanced Treatment of 1,4-Dioxane and PFAS - Emerging Contaminants On the adopted DWSRF base/GS fundable list (loan), SFY2025-26 | $3.64M | Source, p. 27 → |
| Feb 12, 2025 | Construction of an ultraviolet light advanced oxidation process (UV AOP) WTP with granular activated carbon (GAC) to remove per- and polyfluoroalkyl substances (PFAS), 1,4-dioxane, and total trihalomethanes (TTHM) from the drinking water supply On the draft EC fundable list for the 8/12/2026 meeting, SFY2025-26 | $27.6M | Source, p. 30 → |
| Aug 14, 2024 | Planning and Design on behalf of the Town of Lowell for connection to the Marion County Public water system. As private wells located in the Town of Lowell have identified concentrations of PFAS. On the final EC fundable list, SFY2024-25 | $1.25M | Source, p. 28 → |