The water systems New Jersey's own documents tie to PFAS funding: what each project is, the amount the state printed, how far it has got, and the document that says so. Latest record Apr 9, 2026; page updated Nov 2, 2026.
Sources: Final Drinking Water Priority System, Intended Use Plan, and Project Priority List for Fed (2023-12); Final Drinking Water Priority System, Intended Use Plan, and Project Priority List for Fed (2024-05); Final Drinking Water Priority System, Intended Use Plan, and Project Priority List for Fed (2025-07); NJ I-Bank Board Meeting Public Agenda Package, May 14, 2026 - SFY2027 Water Bank Financial (2026-05-14); NJ I-Bank Board Meeting Public Agenda Package, May 14, 2026 - SFY2027 Water Bank Financial (2026-05-14); NJ I-Bank Board Meeting Public Agenda Package, May 14, 2026 - SFY2027 Water Bank Financial (2026-05-14). Open funding rounds and rules for New Jersey →
| Apr 9, 2026 | Summit Lake PFAS On the SFY2027 Water Bank project eligibility list | $3M | Source, p. 60 → |
| Jun 17, 2025 | Summit Lake PFAS Listed "Funded" on the final SFY2026 priority list (a segment has closed on a loan) (amount is the project cost) | $2M | Source, p. 47 → |
| Apr 9, 2026 | PFAS Treatment Improvements at Morris-Delair Water Treatment Plant On the SFY2027 Water Bank project eligibility list | $13M | Source, p. 58 → |
| Apr 9, 2026 | PFAS Treatment Improvements at Morris-Delair Water Treatment Plant On the SFY2027 Water Bank project eligibility list | $74.3M | Source, p. 60 → |
| Jun 17, 2025 | PFAS Treatment Improvements at Morris-Delair Water Treatment Plant Listed "Funded" on the final SFY2026 priority list (a segment has closed on a loan) (amount is the project cost) | $51.4M | Source, p. 46 → |
| May 2024 | PFAS Treatment Improvements at Morris-Delair Water Treatment Plant Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $51.4M | Source, p. 49 → |
| Nov 30, 2023 | PFAS Treatment Improvements at Morris-Delair Water Treatment Plant Ranked on the final SFY2024 drinking water priority list | — | Source, p. 47 → |
| Apr 9, 2026 | Permanent PFAS Treatment (Additional Facilities) On the SFY2027 Water Bank project eligibility list | $5M | Source, p. 60 → |
| Apr 9, 2026 | Permanent PFAS Treatment (Country Club Facility) On the SFY2027 Water Bank project eligibility list | $5.05M | Source, p. 60 → |
| Jun 17, 2025 | Permanent PFAS Treatment (Main Facility) Listed "Funded" on the final SFY2026 priority list (a segment has closed on a loan) (amount is the project cost) | $5.4M | Source, p. 47 → |
| Jun 17, 2025 | Permanent PFAS Treatment (Additional Facilities) Listed "Funded" on the final SFY2026 priority list (a segment has closed on a loan) (amount is the project cost) | $2.4M | Source, p. 47 → |
| Jun 17, 2025 | Permanent PFAS Treatment (Country Club Facility) Listed "Funded" on the final SFY2026 priority list (a segment has closed on a loan) (amount is the project cost) | $2M | Source, p. 47 → |
| Jun 17, 2025 | Interim PFAS-Runnymede Site-Wells 5 &1 On the final SFY2026 priority list; funding status "Beyond 2026" (amount is the project cost) | $1.08M | Source, p. 47 → |
| May 2024 | Interim PFAS-Runnymede Site-Wells 5 &1 Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $1.08M | Source, p. 50 → |
| May 2024 | Permanent PFAS Treatment (Main Facility) Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $5.4M | Source, p. 50 → |
| May 2024 | Permanent PFAS Treatment (Additional Facilities) Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $2.4M | Source, p. 50 → |
| May 2024 | Permanent PFAS Treatment (Country Club Facility) Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $2M | Source, p. 50 → |
| Nov 30, 2023 | Interim PFAS-Runnymede Site-Wells 5 &1 Ranked on the final SFY2024 drinking water priority list | — | Source, p. 48 → |
| Nov 30, 2023 | Permanent PFAS Treatment (Main Facility) Ranked on the final SFY2024 drinking water priority list | — | Source, p. 48 → |
| Nov 30, 2023 | Permanent PFAS Treatment (Additional Facilities) Ranked on the final SFY2024 drinking water priority list | — | Source, p. 48 → |
| Apr 9, 2026 | Lake Stockholm Systems, Inc., PFOA/PFOS removal for NJDEP compliance On the SFY2027 Water Bank project eligibility list | $2.3M | Source, p. 60 → |
| Jun 17, 2025 | Lake Stockholm Systems, Inc., PFOA/PFOS removal for NJDEP compliance Listed "Funded" on the final SFY2026 priority list (a segment has closed on a loan) (amount is the project cost) | $1.02M | Source, p. 47 → |
| May 2024 | Lake Stockholm Systems, Inc., PFOA/PFOS removal for NJDEP compliance Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $1.02M | Source, p. 50 → |
| Nov 30, 2023 | Lake Stockholm Systems, Inc., PFOA/PFOS removal for NJDEP compliance Ranked on the final SFY2024 drinking water priority list | — | Source, p. 48 → |
| Apr 9, 2026 | Livingston PFAS Treatment - Phase A (Wells 1,2,4,8, 11) On the SFY2027 Water Bank project eligibility list | $12M | Source, p. 60 → |
| Apr 9, 2026 | Livingston PFAS Treatment - Phase B (Wells 10, 12) On the SFY2027 Water Bank project eligibility list | $5M | Source, p. 61 → |
| Jun 17, 2025 | Livingston PFAS Treatment - Phase A (Wells 1,2,4,8, 11) Listed "Funded" on the final SFY2026 priority list (a segment has closed on a loan) (amount is the project cost) | $6.96M | Source, p. 47 → |
| Jun 17, 2025 | Livingston PFAS Treatment - Phase B (Wells 10, 12) Listed "Funded" on the final SFY2026 priority list (a segment has closed on a loan) (amount is the project cost) | $4.24M | Source, p. 47 → |
| Jun 17, 2025 | Dorsa Wells - PFAS and 1,4-Dioxane Treatment Listed "Funded" on the final SFY2026 priority list (a segment has closed on a loan) (amount is the project cost) | $17.6M | Source, p. 47 → |
| Jun 17, 2025 | Livingston PFAS Treatment - Phase C (Wells 6, 7, 9) On the final SFY2026 priority list; funding status "Beyond 2026" (amount is the project cost) | $9.8M | Source, p. 47 → |
| May 2024 | Livingston PFAS Treatment - Phase A (Wells 1,2,4,8, 11) Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $6.96M | Source, p. 50 → |
| May 2024 | Livingston PFAS Treatment - Phase B (Wells 10, 12) Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $4.24M | Source, p. 50 → |
| May 2024 | Dorsa Wells - PFAS and 1,4-Dioxane Treatment Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $17.6M | Source, p. 50 → |
| Nov 30, 2023 | Livingston PFAS Treatment - Phase A (Wells 1,2,4,8, 11) Ranked on the final SFY2024 drinking water priority list | — | Source, p. 48 → |
| Nov 30, 2023 | Livingston PFAS Treatment - Phase B (Wells 10, 12) Ranked on the final SFY2024 drinking water priority list | — | Source, p. 48 → |
| Nov 30, 2023 | Dorsa Wells - PFAS and 1,4-Dioxane Treatment Ranked on the final SFY2024 drinking water priority list | — | Source, p. 48 → |
| Apr 9, 2026 | Water Treatment Centralization for PFAS Removal On the SFY2027 Water Bank project eligibility list | $61.4M | Source, p. 61 → |
| Apr 9, 2026 | Water Treatment Centralization for PFAS Removal Phase 2 On the SFY2027 Water Bank project eligibility list | $18M | Source, p. 61 → |
| Apr 9, 2026 | Water Treatment Centralization for PFAS Removal Phase 3 On the SFY2027 Water Bank project eligibility list | $9.6M | Source, p. 61 → |
| Apr 9, 2026 | Water Treatment Centralization for PFAS Removal Phase 4 On the SFY2027 Water Bank project eligibility list | $12.8M | Source, p. 61 → |
| Apr 9, 2026 | Water Treatment Centralization for PFAS Removal Phase 5 On the SFY2027 Water Bank project eligibility list | $6.3M | Source, p. 61 → |
| Apr 9, 2026 | Water Treatment Centralization for PFAS Removal Phase 6 On the SFY2027 Water Bank project eligibility list | $6.3M | Source, p. 61 → |
| Jun 17, 2025 | Water Treatment Centralization for PFAS Removal Listed "Funded" on the final SFY2026 priority list (a segment has closed on a loan) (amount is the project cost) | $77.6M | Source, p. 47 → |
| Jun 17, 2025 | Water Treatment Centralization for PFAS Removal Phase 2 Listed "Funded" on the final SFY2026 priority list (a segment has closed on a loan) (amount is the project cost) | $17M | Source, p. 47 → |
| Jun 17, 2025 | Water Treatment Centralization for PFAS Removal Phase 3 Listed "Funded" on the final SFY2026 priority list (a segment has closed on a loan) (amount is the project cost) | $9.2M | Source, p. 47 → |
| Jun 17, 2025 | Water Treatment Centralization for PFAS Removal Phase 4 On the final SFY2026 priority list; anticipated to close in 2026 (amount is the project cost) | $5.8M | Source, p. 47 → |
| Jun 17, 2025 | Water Treatment Centralization for PFAS Removal Phase 5 On the final SFY2026 priority list; anticipated to close in 2026 (amount is the project cost) | $3.31M | Source, p. 47 → |
| Jun 17, 2025 | Water Treatment Centralization for PFAS Removal Phase 6 On the final SFY2026 priority list; anticipated to close in 2026 (amount is the project cost) | $3.43M | Source, p. 47 → |
| May 2024 | Water Treatment Centralization for PFAS Removal Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $77.6M | Source, p. 50 → |
| May 2024 | Water Treatment Centralization for PFAS Removal Phase 2 Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $17M | Source, p. 50 → |
| May 2024 | Water Treatment Centralization for PFAS Removal Phase 3 Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $9.2M | Source, p. 50 → |
| May 2024 | Water Treatment Centralization for PFAS Removal Phase 4 Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $5.8M | Source, p. 50 → |
| May 2024 | Water Treatment Centralization for PFAS Removal Phase 5 Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $3.31M | Source, p. 50 → |
| May 2024 | Water Treatment Centralization for PFAS Removal Phase 6 Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $3.43M | Source, p. 50 → |
| Nov 30, 2023 | Water Treatment Centralization for PFAS Removal Ranked on the final SFY2024 drinking water priority list | — | Source, p. 48 → |
| Nov 30, 2023 | Water Treatment Centralization for PFAS Removal Phase 2 Ranked on the final SFY2024 drinking water priority list | — | Source, p. 48 → |
| Nov 30, 2023 | Water Treatment Centralization for PFAS Removal Phase 3 Ranked on the final SFY2024 drinking water priority list | — | Source, p. 48 → |
| Nov 30, 2023 | Water Treatment Centralization for PFAS Removal Phase 4 Ranked on the final SFY2024 drinking water priority list | — | Source, p. 48 → |
| Nov 30, 2023 | Water Treatment Centralization for PFAS Removal Phase 5 Ranked on the final SFY2024 drinking water priority list | — | Source, p. 48 → |
| Nov 30, 2023 | Water Treatment Centralization for PFAS Removal Phase 6 Ranked on the final SFY2024 drinking water priority list | — | Source, p. 48 → |
| Jun 17, 2025 | Hawthorne Water Utility PFAs Treatment Listed "Funded" on the final SFY2026 priority list (a segment has closed on a loan) (amount is the project cost) | $4.75M | Source, p. 51 → |
| May 8, 2025 | Project # 1604001-002 (EC). Water Utility treatment at existing 4 points of entry for PFOS. Long-term loan financed by I-Bank Series 2025 A-SW1, C-SW1 bonds (amount is the bond-financed share) | $2.56M | Source, p. 101 → |
| May 2024 | Hawthorne Water Utility PFAs Treatment Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $4.75M | Source, p. 54 → |
| Nov 30, 2023 | Hawthorne Water Utility PFAs Treatment Ranked on the final SFY2024 drinking water priority list | — | Source, p. 53 → |
| Jun 17, 2025 | Addition of PFOS Treatment at Exisiting Water Plant Listed "Funded" on the final SFY2026 priority list (a segment has closed on a loan) (amount is the project cost) | $1.53M | Source, p. 47 → |
| May 2024 | Addition of PFOS Treatment at Exisiting Water Plant Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $1.53M | Source, p. 49 → |
| Dec 6, 2023 | Project # 0812001-005 (Nano). Addition of PFOS Treatment at Existing Water Plant Long-term loan financed by I-Bank Series 2023 A-W1, C-W1 bonds (amount is the bond-financed share) | $183k | Source, p. 98 → |
| Nov 30, 2023 | Addition of PFOS Treatment at Exisiting Water Plant Ranked on the final SFY2024 drinking water priority list | — | Source, p. 48 → |
| Jun 17, 2025 | Orange Twp PFOA in Well 8 Drinking Water System Listed "Funded" on the final SFY2026 priority list (a segment has closed on a loan) (amount is the project cost) | $1.55M | Source, p. 46 → |
| Jun 17, 2025 | Orange Twp |PFAS in Well 7 Drinking Water System On the final SFY2026 priority list; funding status "Beyond 2026" (amount is the project cost) | $1.44M | Source, p. 46 → |
| Jun 17, 2025 | PFAS Treatment at Chestnut Street Pumping Station On the final SFY2026 priority list; anticipated to close in 2026 (amount is the project cost) | $17M | Source, p. 47 → |
| May 2024 | Orange Twp |PFAS in Well 7 Drinking Water System Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $1.44M | Source, p. 49 → |
| May 2024 | Orange Twp PFOA in Well 8 Drinking Water System Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $1.55M | Source, p. 49 → |
| May 2024 | PFAS Treatment at Chestnut Street Pumping Station Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $17M | Source, p. 49 → |
| Nov 30, 2023 | Orange Twp |PFAS in Well 7 Drinking Water System Ranked on the final SFY2024 drinking water priority list | — | Source, p. 47 → |
| Nov 30, 2023 | Orange Twp PFOA in Well 8 Drinking Water System Ranked on the final SFY2024 drinking water priority list | — | Source, p. 47 → |
| Nov 30, 2023 | PFAS Treatment at Chestnut Street Pumping Station Ranked on the final SFY2024 drinking water priority list | — | Source, p. 48 → |
| Jun 17, 2025 | Well5A PFOS Treatment System Upgrade Listed "Funded" on the final SFY2026 priority list (a segment has closed on a loan) (amount is the project cost) | $4.65M | Source, p. 51 → |
| May 8, 2025 | Project # 0338001-010. Upgrade the existing 2.0 MGD water treatment plant to remove PFOS/PFAS from the Well 5A raw water. Long-term loan financed by I-Bank Series 2025 A-SW1, C-SW1 bonds (amount is the bond-financed share) | $1.26M | Source, p. 102 → |
| May 2024 | Well5A PFOS Treatment System Upgrade Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $4.65M | Source, p. 54 → |
| Nov 30, 2023 | Well5A PFOS Treatment System Upgrade Ranked on the final SFY2024 drinking water priority list | — | Source, p. 54 → |
| May 8, 2025 | Project # 0228001-002 (EC). Installing water treatment for perfluorochemicals (PFCs) at the 4 points of entry. Long-term loan financed by I-Bank Series 2025 A-SW1, C-SW1 bonds (amount is the bond-financed share) | $1.37M | Source, p. 101 → |
| May 8, 2025 | Project # 0264001-003 (EC). Installation of GAC Units at existing six wells to treat for PFOS and PFOA. Long-term loan financed by I-Bank Series 2025 A-SW1, C-SW1 bonds (amount is the bond-financed share) | $2.18M | Source, p. 102 → |
| Apr 9, 2026 | Netherwood PFAS Treatment On the SFY2027 Water Bank project eligibility list | $20M | Source, p. 61 → |
| Jun 17, 2025 | Netherwood PFAS Treatment On the final SFY2026 priority list; anticipated to close in 2026 (amount is the project cost) | $18.8M | Source, p. 49 → |
| May 2024 | Netherwood PFAS Treatment Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $18.8M | Source, p. 52 → |
| Nov 30, 2023 | Netherwood PFAS Treatment Ranked on the final SFY2024 drinking water priority list | — | Source, p. 51 → |
| Apr 9, 2026 | Arrow Road PFAS Treatment On the SFY2027 Water Bank project eligibility list | $3.95M | Source, p. 61 → |
| Jun 17, 2025 | Arrow Road PFAS Treatment On the final SFY2026 priority list; anticipated to close in 2026 (amount is the project cost) | $2.8M | Source, p. 47 → |
| Jun 17, 2025 | PFAS Treatment - Darlington, Brookfield, N. Central and Spring On the final SFY2026 priority list; funding status "Beyond 2026" (amount is the project cost) | $10.9M | Source, p. 47 → |
| Apr 9, 2026 | WTMUA – SM-10 and SM-17 PFAS Treatment Improvements On the SFY2027 Water Bank project eligibility list | $9.1M | Source, p. 61 → |
| Jun 17, 2025 | WTMUA – SM-10 and SM-17 PFAS Treatment Improvements On the final SFY2026 priority list; funding status "Beyond 2026" (amount is the project cost) | $3.96M | Source, p. 48 → |
| May 2024 | WTMUA – SM-10 and SM-17 PFAS Treatment Improvements Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $3.96M | Source, p. 51 → |
| Nov 30, 2023 | WTMUA – SM-10 and SM-17 PFAS Treatment Improvements Ranked on the final SFY2024 drinking water priority list | — | Source, p. 50 → |
| Jun 17, 2025 | AQUA-NJ: Hamilton System - PFAS Treatment - Well 11C On the final SFY2026 priority list; funding status "Beyond 2026" (amount is the project cost) | $4.35M | Source, p. 48 → |
| Jun 17, 2025 | AQUA-NJ: Hamilton System - PFAS Treatment - Well 12C On the final SFY2026 priority list; funding status "Beyond 2026" (amount is the project cost) | $4.35M | Source, p. 48 → |
| Jun 17, 2025 | AQUA-NJ: Hamilton System - PFAS Treatment - Well 13C On the final SFY2026 priority list; funding status "Beyond 2026" (amount is the project cost) | $3.15M | Source, p. 48 → |
| Jun 17, 2025 | AQUA Hamilton PFAS Treatment On the final SFY2026 priority list; funding status "Beyond 2026" (amount is the project cost) | $19.5M | Source, p. 50 → |
| May 2024 | AQUA Hamilton PFAS Treatment Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $19.5M | Source, p. 53 → |
| Nov 30, 2023 | AQUA Hamilton PFAS Treatment Ranked on the final SFY2024 drinking water priority list | — | Source, p. 52 → |
| Jun 17, 2025 | Thomas B. Conley Elementary School Treatment System PFAS On the final SFY2026 priority list; funding status "Beyond 2026" (amount is the project cost) | $1M | Source, p. 47 → |
| May 2024 | Thomas B. Conley Elementary School Treatment System PFAS Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $1M | Source, p. 50 → |
| Nov 30, 2023 | Thomas B. Conley Elementary School Treatment System PFAS Ranked on the final SFY2024 drinking water priority list | — | Source, p. 48 → |
| Jun 17, 2025 | Wellfield PFAS Treatment Improvements (Boonton Town) On the final SFY2026 priority list; funding status "Beyond 2026" (amount is the project cost) | $5.48M | Source, p. 48 → |
| May 2024 | Wellfield PFAS Treatment Improvements (Boonton Town) Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $5.48M | Source, p. 51 → |
| Nov 30, 2023 | Wellfield PFAS Treatment Improvements (Boonton Town) Ranked on the final SFY2024 drinking water priority list | — | Source, p. 50 → |
| Jun 17, 2025 | PFOS Treatment On the final SFY2026 priority list; funding status "Beyond 2026" (amount is the project cost) | $1.2M | Source, p. 48 → |
| May 2024 | PFOS Treatment Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $1.2M | Source, p. 50 → |
| Nov 30, 2023 | PFOS Treatment Ranked on the final SFY2024 drinking water priority list | — | Source, p. 49 → |
| Jun 17, 2025 | Town of Clinton - Wells 3A, 16 - PFAS Treatment Improvements On the final SFY2026 priority list; funding status "Beyond 2026" (amount is the project cost) | $8.63M | Source, p. 47 → |
| Jun 17, 2025 | Town of Clinton - Wells 11, 12R & 15 - PFAS Treatment Improvements On the final SFY2026 priority list; funding status "Beyond 2026" (amount is the project cost) | $7.8M | Source, p. 50 → |
| Jun 17, 2025 | Town of Clinton - Lebanon Well #2 - PFAS Treatment and Well Improveme On the final SFY2026 priority list; funding status "Beyond 2026" (amount is the project cost) | $4.81M | Source, p. 50 → |
| May 2024 | Town of Clinton - Wells 11, 12R & 15 - PFAS Treatment Improvements Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $7.8M | Source, p. 53 → |
| May 2024 | Town of Clinton - Lebanon Well #2 - PFAS Treatment and Well Improvements Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $4.81M | Source, p. 53 → |
| Nov 30, 2023 | Town of Clinton - Lebanon Well #2 - PFAS Treatment and Well Improvements Ranked on the final SFY2024 drinking water priority list | — | Source, p. 53 → |
| Nov 30, 2023 | Town of Clinton - Wells 11, 12R & 15 - PFAS Treatment Improvements Ranked on the final SFY2024 drinking water priority list | — | Source, p. 53 → |
| Jun 17, 2025 | PFAS Treatment On the final SFY2026 priority list; funding status "Beyond 2026" (amount is the project cost) | $34.9M | Source, p. 46 → |
| Jun 17, 2025 | PFOS TREATMENT On the final SFY2026 priority list; funding status "Beyond 2026" (amount is the project cost) | $5.8M | Source, p. 46 → |
| Jun 17, 2025 | Hopatcong Borough PFAS Removal Improvement Project On the final SFY2026 priority list; funding status "Beyond 2026" (amount is the project cost) | $1.02M | Source, p. 46 → |
| May 2024 | Hopatcong Borough PFAS Removal Improvement Project Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $1.02M | Source, p. 49 → |
| Nov 30, 2023 | Hopatcong Borough PFAS Removal Improvement Project Ranked on the final SFY2024 drinking water priority list | — | Source, p. 47 → |
| Jun 17, 2025 | PFAS Treatment at CJO Plant On the final SFY2026 priority list; funding status "Beyond 2026" (amount is the project cost) | $206M | Source, p. 47 → |
| May 2024 | PFAS Treatment at CJO Plant Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $206M | Source, p. 50 → |
| Jun 17, 2025 | Montclair Township - PFOAS and Perchlorate Treatment - Rand Well On the final SFY2026 priority list; funding status "Beyond 2026" (amount is the project cost) | $770k | Source, p. 50 → |
| May 2024 | Montclair Township - PFOAS and Perchlorate Treatment - Rand Well Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $770k | Source, p. 52 → |
| Nov 30, 2023 | Montclair Township - PFOAS and Perchlorate Treatment - Rand Well Ranked on the final SFY2024 drinking water priority list | — | Source, p. 52 → |
| Jun 17, 2025 | Soons Wellfield PFAS Treatment On the final SFY2026 priority list; funding status "Beyond 2026" (amount is the project cost) | $1.64M | Source, p. 47 → |
| May 2024 | Soons Wellfield PFAS Treatment Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $1.64M | Source, p. 50 → |
| Nov 30, 2023 | Soons Wellfield PFAS Treatment Ranked on the final SFY2024 drinking water priority list | — | Source, p. 48 → |
| Jun 17, 2025 | Permanent PFAS Treatment On the final SFY2026 priority list; anticipated to close in 2026 (amount is the project cost) | $6.02M | Source, p. 47 → |
| May 2024 | Permanent PFAS Treatment Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $6.02M | Source, p. 49 → |
| Nov 30, 2023 | Permanent PFAS Treatment Ranked on the final SFY2024 drinking water priority list | — | Source, p. 48 → |
| Jun 17, 2025 | Replacement Well 20-R VOC/PFAS Treatment On the final SFY2026 priority list; anticipated to close in 2026 (amount is the project cost) | $5.33M | Source, p. 48 → |
| Jun 17, 2025 | Hills of Troy Water Treatment Plant (Wells 9, 10 & 18 PFAS Treatment) On the final SFY2026 priority list; funding status "Beyond 2026" (amount is the project cost) | $6.5M | Source, p. 50 → |
| Jun 17, 2025 | PFOS & PFOA Treatment for Well #1 Dunn Place NJ1431001 On the final SFY2026 priority list; anticipated to close in 2026 (amount is the project cost) | $3.32M | Source, p. 47 → |
| May 2024 | PFOS & PFOA Treatment for Well #1 Dunn Place NJ1431001 Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $3.32M | Source, p. 50 → |
| Nov 30, 2023 | PFOS & PFOA Treatment for Well #1 Dunn Place NJ1431001 Ranked on the final SFY2024 drinking water priority list | — | Source, p. 48 → |
| Jun 17, 2025 | Well 2 PFAS Treatment Facility On the final SFY2026 priority list; funding status "Beyond 2026" (amount is the project cost) | $6.23M | Source, p. 50 → |
| May 2024 | Well 2 PFAS Treatment Facility Ranked on the SFY2025 drinking water priority list (amount is the project cost) | $6.23M | Source, p. 53 → |
| Nov 30, 2023 | Well 2 PFAS Treatment Facility Ranked on the final SFY2024 drinking water priority list | — | Source, p. 53 → |