The water systems North Carolina's own documents tie to PFAS funding: what each project is, the amount the state printed, how far it has got, and the document that says so. Latest record Jul 15, 2026; page updated Nov 2, 2026.
Sources: Applications Selected for Funding by the State Water Infrastructure Authority on February (2024-02-20); Applications selected for funding by the State Water Infrastructure Authority on April 15, (2026-04-15); Applications selected for funding by the State Water Infrastructure Authority on February (2026-02-18); Applications selected for funding by the State Water Infrastructure Authority on July 15, (2026-07-15); Applications selected for funding by the State Water Infrastructure Authority on July 16, (2024-07-16); Applications selected for funding by the State Water Infrastructure Authority on July 16, (2025-07-16); Draft FY2026 IIJA Drinking Water SRF - Emerging Contaminants Intended Use Plan (2026-03). Open funding rounds and rules for North Carolina →
| Jul 15, 2026 | Emerging Contaminants/PFAS Study Approved by the State Water Infrastructure Authority (all programs combined) | $500k | Source, p. 1 → |
| Jul 15, 2026 | Graham-Mebane WTP Reliability Approved by the State Water Infrastructure Authority (all programs combined) | $26.6M | Source, p. 1 → |
| Feb 18, 2026 | Graham-Mebane WTP PFAS Improvements Approved by the State Water Infrastructure Authority (all programs combined) | $3M | Source, p. 1 → |
| Feb 2026 | Graham-Mebane WTP PFAS Improvements (Construction) Requested, not funded | $30.3M | Source, p. 21 → |
| Jul 2025 | Graham-Mebane WTP Improvements (Construction) Emerging-contaminant award (100% principal forgiveness) | $3.44M | Source, p. 25 → |
| Feb 2025 | Graham- Mebane WTP Improvements (Construction) Requested, not funded | $30.3M | Source, p. 31 → |
| Feb 2024 | Drinking Water EC Study (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 41 → |
| Jul 15, 2026 | Siler City PFAS Treatment Construction Approved by the State Water Infrastructure Authority (all programs combined) | $5M | Source, p. 1 → |
| Feb 2024 | PFOS Compliance Planning Study (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $400k | Source, p. 42 → |
| Jul 15, 2026 | Post-Filter PFAS Treatment Improvements Approved by the State Water Infrastructure Authority (all programs combined) | $841k | Source, p. 1 → |
| Feb 18, 2026 | Post-Filter PFAS Treatment Improvements Approved by the State Water Infrastructure Authority (all programs combined) | $10.7M | Source, p. 2 → |
| Feb 2026 | Post-Filter PFAS Treatment Improvements (Construction) Emerging-contaminant award (100% principal forgiveness) | $3.66M | Source, p. 21 → |
| Jul 2025 | PFAS Pilot, Planning and Engineering (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 29 → |
| Jul 2025 | Post-Filter PFAS Treatment Improvements (Construction) Requested, not funded | $21.7M | Source, p. 28 → |
| Jul 2024 | Post-Filter PFAS Treatment Improvements (Construction) Requested, not funded (bypassed) | $22.2M | Source, p. 37 → |
| Feb 2024 | Pilot Evaluation and Planning Study (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 42 → |
| Feb 2024 | Post-Filter PFAS Treatment Improvements (Construction) Requested, not funded (bypassed) | $22.2M | Source, p. 40 → |
| Apr 15, 2026 | Yadkin WTP - PFAS Pilot Study Approved by the State Water Infrastructure Authority (all programs combined) | $500k | Source, p. 3 → |
| Feb 18, 2026 | PFAS Drinking Water Treatment Upgrades Approved by the State Water Infrastructure Authority (all programs combined) | $3M | Source, p. 1 → |
| Feb 2026 | PFAS Drinking Water Treatment Upgrades (Construction) Requested, not funded | $51.7M | Source, p. 22 → |
| Jul 2025 | PFAS Drinking Water Treatment Upgrades (Construction) Requested, not funded | $28.2M | Source, p. 28 → |
| Feb 2025 | PFAS Drinking Water Treatment Upgrades (Construction) Requested, not funded | $28.2M | Source, p. 34 → |
| Jul 2024 | GAC Construction Project (Construction) Requested, not funded (bypassed) | $28.2M | Source, p. 37 → |
| Feb 2024 | City of Burlington EC Study (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 42 → |
| Feb 18, 2026 | PFAS Treatment Improvement Project Approved by the State Water Infrastructure Authority (all programs combined) | $33M | Source, p. 5 → |
| Feb 2026 | PFAS Treatment Improvement Project (Construction) Emerging-contaminant award (100% principal forgiveness) | $5M | Source, p. 21 → |
| Jul 2025 | PFAS Treatment Preliminary Engineering (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 29 → |
| Feb 2025 | PFAS Treatment Improvement Project (Construction) Requested, not funded | $35.6M | Source, p. 34 → |
| Jul 2024 | PFAS Treatment Evaluation and Pilot (Evaluation/Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 38 → |
| Jul 2024 | PFAS Treatment Improvement Project (Construction) Requested, not funded (bypassed) | $35.6M | Source, p. 37 → |
| Feb 18, 2026 | Mitchell WTP Advanced Treatment for EC Approved by the State Water Infrastructure Authority (all programs combined) | $3M | Source, p. 2 → |
| Feb 2026 | Mitchell WTP Advanced Treatment for EC (Construction) Requested, not funded | $87.8M | Source, p. 22 → |
| Jul 2025 | Mitchell WTP ATEC Design (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 29 → |
| Jul 2025 | Mitchell WTP Advanced Treatment for EC (Construction) Requested, not funded | $87.8M | Source, p. 28 → |
| Feb 2025 | Mitchell WTP Advanced Treatment for ECs (Construction) Requested, not funded | $55.7M | Source, p. 33 → |
| Jul 2024 | Greensboro Mitchell ATEC (Construction) Requested, not funded (bypassed) | $55.7M | Source, p. 37 → |
| Feb 2024 | Greensboro Mitchell ATEC (Construction) Requested, not funded (bypassed) | $55.7M | Source, p. 40 → |
| Feb 18, 2026 | Drinking Water EC Construction Project Approved by the State Water Infrastructure Authority (all programs combined) | $3M | Source, p. 2 → |
| Feb 2026 | Drinking Water EC Construction Project (Construction) Requested, not funded | $44.7M | Source, p. 22 → |
| Jul 2025 | Drinking Water EC Construction Project (Construction) Requested, not funded (bypassed) | $31.1M | Source, p. 25 → |
| Feb 2025 | Drinking Water EC Construction Project (Construction) Emerging-contaminant award (100% principal forgiveness) | $5M | Source, p. 31 → |
| Jul 2024 | Drinking Water Emerging Contaminant Study (Evaluation/Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 37 → |
| Feb 2026 | PFAS Site Improvements (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 23 → |
| Feb 2025 | PFAS Implementation Program (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 34 → |
| Feb 2026 | PWC PO Hoffer GL GAC (Construction) Requested, not funded (bypassed) | $62.4M | Source, p. 21 → |
| Jul 16, 2025 | PO Hoffer/Glenville Lake WTP GAC Facilit Approved by the State Water Infrastructure Authority (all programs combined) | $20.5M | Source, p. 1 → |
| Jul 2025 | PO Hoffer/Glenville Lake WTP GAC Facilit (Construction) Emerging-contaminant award (100% principal forgiveness) | $5M | Source, p. 25 → |
| Feb 2025 | PO Hoffer/Glenville Lake WTP GAC Facility (Construction) Requested, not funded (bypassed) | $51.2M | Source, p. 31 → |
| Jul 16, 2024 | PO Hoffer Glenville Lake GAC Construction Approved by the State Water Infrastructure Authority (all programs combined) | $30M | Source, p. 1 → |
| Jul 2024 | PO Hoffer Glenville Lake GAC Construction (Construction) Emerging-contaminant award (100% principal forgiveness) | $5M | Source, p. 36 → |
| Feb 20, 2024 | PO Hoffer Glenville Lake GAC Construction Approved by the State Water Infrastructure Authority (all programs combined) | $30M | Source, p. 1 → |
| Feb 2024 | PO Hoffer Glenville Lake GAC Constructio (Construction) Emerging-contaminant award (100% principal forgiveness) | $5M | Source, p. 39 → |
| Feb 2024 | PO Hoffer Glenville GAC Design (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 41 → |
| Feb 2026 | Chatham County WTP EC Study (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 23 → |
| Sep 2025 | Iredell Water Corp Wells PFAS (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 24 → |
| Jul 16, 2025 | Brookwood Community Ion Exchange Filters Approved by the State Water Infrastructure Authority (all programs combined) | $3.98M | Source, p. 1 → |
| Jul 2025 | Brookwood Community Ion Exchange Filters (Construction) Emerging-contaminant award (100% principal forgiveness) | $1.33M | Source, p. 24 → |
| Jul 2025 | Brookwood Community Ion Exchange Filters (Construction) Emerging-contaminant award (100% principal forgiveness) | $3.67M | Source, p. 25 → |
| Jul 2025 | Brookwood Community Ion Exchange Filters (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 29 → |
| Jul 16, 2024 | Brookwood Community Ion Exchange Filters Approved by the State Water Infrastructure Authority (all programs combined) | $5.8M | Source, p. 1 → |
| Jul 2024 | Brookwood Community Ion Exchange Filters (Construction) Emerging-contaminant award (100% principal forgiveness) | $1.45M | Source, p. 36 → |
| Feb 2024 | Brookwood Community Ion Exchange Filters (Construction) Requested, not funded (bypassed) | $5.8M | Source, p. 40 → |
| Jul 2025 | PFAS Implementation - College Park (Construction) Emerging-contaminant award (100% principal forgiveness) | $614k | Source, p. 25 → |
| Jul 2025 | PFAS Implementation - Tanglewood Estates (Construction) Emerging-contaminant award (100% principal forgiveness) | $450k | Source, p. 25 → |
| Jul 2025 | Gray’s Creek Phase 2 (Construction) Emerging-contaminant award (100% principal forgiveness) | $5M | Source, p. 24 → |
| Feb 2025 | Cedar Creek Area PER to address PFAS (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 34 → |
| Feb 20, 2024 | Gray's Creek Phase 1 Approved by the State Water Infrastructure Authority (all programs combined) | $7.64M | Source, p. 1 → |
| Feb 2024 | Gray's Creek Phase 1 (Construction) Emerging-contaminant award (100% principal forgiveness) | $5M | Source, p. 39 → |
| Feb 2024 | Cedar Creek Phase I (Construction) Requested, not funded (bypassed) | $18.5M | Source, p. 40 → |
| Jul 2025 | PFAS Treatment Evaluation and Pilot Test (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 30 → |
| Feb 2024 | Harnett Regional WTP PFAS Pilot Study (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 42 → |
| Jul 2025 | TGB WTP PFAS Treatment Addition (Construction) Requested, not funded | $4.1M | Source, p. 26 → |
| Feb 2025 | TGB WTP PFAS Treatment Addition (Construction) Requested, not funded | $4.1M | Source, p. 31 → |
| Feb 2024 | TGB WTP PFAS Treatment Study (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $330k | Source, p. 42 → |
| Jul 2025 | GAC Filters for PFAS Removal (Construction) Emerging-contaminant award (100% principal forgiveness) | $1.02M | Source, p. 25 → |
| Feb 2024 | PFAS Eval. & Assessment Study for WTP (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 41 → |
| Feb 2025 | Durham PFAS Consulting Support (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $392k | Source, p. 35 → |
| Dec 2024 | Emerging Contaminants Study (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 35 → |
| Dec 2024 | PFAS Treatment at Jones Ferry WTP (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 35 → |
| Jul 2024 | PFAS Treatment at Jones Ferry WTP (Evaluation/Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 38 → |
| Dec 2024 | Emerging Contaminants Study (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 35 → |
| Jul 2024 | PFAS Construction RO Treatment System (Construction) Requested, not funded (bypassed) | $74.6M | Source, p. 38 → |
| Feb 2024 | PFAS Study- RO Treatment System (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 43 → |
| Feb 2024 | PFAS Construction RO Treatment Sys (Construction) Requested, not funded (bypassed) | $74.6M | Source, p. 41 → |
| Jul 16, 2024 | Sanford WFF - GAC Facility Approved by the State Water Infrastructure Authority (all programs combined) | $10.5M | Source, p. 1 → |
| Jul 2024 | Sanford WFF - GAC Facility (Construction) Emerging-contaminant award (100% principal forgiveness) | $5M | Source, p. 36 → |
| Feb 2024 | Sanford WFF - GAC Facility (Construction) Requested, not funded (bypassed) | $10.5M | Source, p. 39 → |
| Jul 16, 2024 | Sanford WFF Expansion - GAC Facility Approved by the State Water Infrastructure Authority (all programs combined) | $7.02M | Source, p. 1 → |
| Jul 2024 | Sanford WFF Expansion – GAC Facility (Construction) Emerging-contaminant award (100% principal forgiveness) | $5M | Source, p. 36 → |
| Feb 2024 | Sanford WFF Expansion – GAC Facility (Construction) Requested, not funded (bypassed) | $7.02M | Source, p. 39 → |
| Jul 2024 | W L Brown WTP Emerg Cont Planning Study (Evaluation/Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 38 → |
| Jul 2024 | PFAS Treatment (Construction) Emerging-contaminant award (100% principal forgiveness) | $2.16M | Source, p. 36 → |
| Feb 20, 2024 | PFAS Treatment Approved by the State Water Infrastructure Authority (all programs combined) | $30M | Source, p. 2 → |
| Feb 2024 | PFAS Treatment (Construction) Emerging-contaminant award (100% principal forgiveness) | $5M | Source, p. 39 → |
| Feb 2024 | PFAS Treatment Study (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 40 → |
| Jul 2024 | PFAS Treatment at Rocky Mount WTPs (Evaluation/Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 38 → |
| Feb 2024 | PFAS Compliance Planning Study (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $400k | Source, p. 41 → |
| Feb 2024 | PFAS Study Water Treatment Plant (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 42 → |
| Feb 2024 | Norwood PFAS Study Project (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $500k | Source, p. 42 → |
| Feb 2024 | PFAS Treatment Alternatives Study (Evaluation/ Assessment Project) Emerging-contaminant award (100% principal forgiveness) | $400k | Source, p. 42 → |
| Jul 2025 | Water Service for PFAS Contaminated Well (Construction) Requested, not funded | $924k | Source, p. 28 → |
| Jul 2025 | Arlington Heights Water Extension PFAS (Construction) Requested, not funded | $2.62M | Source, p. 26 → |
| Jul 2025 | Blossom St Area Water Main Ext PFAS (Construction) Requested, not funded | $1.91M | Source, p. 26 → |
| Jul 2025 | Brentwood Area Water Main Ext - PFAS (Construction) Requested, not funded | $1.25M | Source, p. 26 → |
| Jul 2025 | Burton Area Water Main Ext - PFAS (Construction) Requested, not funded | $2.14M | Source, p. 26 → |
| Jul 2025 | Chadwick Acres Area Water Main Ext -PFAS (Construction) Requested, not funded | $658k | Source, p. 26 → |
| Jul 2025 | Garden Place CFPUA Water Ext PFAS (Construction) Requested, not funded | $1.28M | Source, p. 26 → |
| Jul 2025 | Hanover Gardens Area Water Main Ext-PFAS (Construction) Requested, not funded | $667k | Source, p. 26 → |
| Jul 2025 | Marathon Farms Water Ext. to PFAS Wells (Construction) Requested, not funded | $7.78M | Source, p. 27 → |
| Jul 2025 | North College Water Ext. to PFAS Wells (Construction) Requested, not funded | $960k | Source, p. 27 → |
| Jul 2025 | Oakley Water Ext. to PFAS Wells (Construction) Requested, not funded | $7.02M | Source, p. 27 → |
| Jul 2025 | Old Bridge Site Water Ext. to PFAS Wells (Construction) Requested, not funded | $3.43M | Source, p. 27 → |
| Jul 2025 | Orange Street Water Ext. to PFAS Wells (Construction) Requested, not funded | $1.19M | Source, p. 27 → |
| Jul 2025 | Prince George & Lynn Water Ext. to PFAS (Construction) Requested, not funded | $3.09M | Source, p. 27 → |
| Jul 2025 | Whitman Water Main Ext. to PFAS Wells (Construction) Requested, not funded | $1.14M | Source, p. 27 → |
| Jul 2025 | Wrightsboro Acres Water Ext. to PFAS (Construction) Requested, not funded | $3.31M | Source, p. 27 → |
| Jul 2025 | NHC Garden Place Water Main Ext PFAS (Construction) Requested, not funded | $1.96M | Source, p. 28 → |
| Feb 2025 | Brentwood Area Water Main Ext - PFAS (Construction) Requested, not funded | $1.25M | Source, p. 31 → |
| Feb 2025 | Chadwick Acres Area Water Main Ext -PFAS (Construction) Requested, not funded | $658k | Source, p. 32 → |
| Feb 2025 | Hanover Gardens Area Water Main Ext-PFAS (Construction) Requested, not funded | $667k | Source, p. 32 → |
| Feb 2025 | Garden Place CFPUA Water Ext PFAS (Construction) Requested, not funded | $1.28M | Source, p. 32 → |
| Feb 2025 | Wrightsboro Acres Water Ext. to PFAS (Construction) Requested, not funded | $3.31M | Source, p. 32 → |
| Feb 2025 | Arlington Heights Water Extension PFAS (Construction) Requested, not funded | $2.62M | Source, p. 32 → |
| Feb 2025 | Whitman Water Main Ext. to PFAS Wells (Construction) Requested, not funded | $1.14M | Source, p. 32 → |
| Feb 2025 | Prince George & Lynn Water Ext. to PFAS (Construction) Requested, not funded | $3.09M | Source, p. 32 → |
| Feb 2025 | Old Bridge Site Water Ext. to PFAS Wells (Construction) Requested, not funded | $3.43M | Source, p. 32 → |
| Feb 2025 | North College Water Ext. to PFAS Wells (Construction) Requested, not funded | $960k | Source, p. 33 → |
| Feb 2025 | Orange Street Water Ext. to PFAS Wells (Construction) Requested, not funded | $1.19M | Source, p. 33 → |
| Feb 2025 | Oakley Water Ext. to PFAS Wells (Construction) Requested, not funded | $7.02M | Source, p. 33 → |
| Feb 2025 | Marathon Farms Water Ext. to PFAS Wells (Construction) Requested, not funded | $7.78M | Source, p. 33 → |
| Feb 2025 | Blossom St Area Water Main Ext PFAS (Construction) Requested, not funded | $1.91M | Source, p. 33 → |
| Feb 2025 | Burton Area Water Main Ext - PFAS (Construction) Requested, not funded | $2.14M | Source, p. 33 → |
| Feb 2025 | NHC Garden Place Water Main Ext PFAS (Construction) Requested, not funded | $1.96M | Source, p. 33 → |
| Jul 2024 | Alandale Area Water Extension - PFAS (Construction) Requested, not funded | $2.55M | Source, p. 36 → |
| Jul 2024 | Rockhill Area Water Extension - PFAS (Construction) Requested, not funded (bypassed) | $672k | Source, p. 37 → |
| Feb 2024 | Alandale Area Water Extension - PFAS (Construction) Requested, not funded (bypassed) | $2.55M | Source, p. 40 → |
| Feb 2024 | Rockhill Area Water Extension - PFAS (Construction) Requested, not funded (bypassed) | $672k | Source, p. 41 → |
| Jul 2025 | Old Warsaw Rd Water Main Extensions (Construction) Requested, not funded | $3.34M | Source, p. 28 → |
| Jul 2024 | BHI DW Construction- Emerging Contaminant (Construction) Requested, not funded (bypassed) | $5M | Source, p. 37 → |
| Feb 2024 | BHI DW Construction- Emerging Contaminant (Construction) Requested, not funded (bypassed) | $5M | Source, p. 40 → |
| Jul 2024 | GAC Filter Media Replacement (Construction) Requested, not funded (bypassed) | $1.81M | Source, p. 37 → |
| Feb 2024 | GAC Filter Media Replacement (Construction) Requested, not funded (bypassed) | $1.81M | Source, p. 41 → |