One or more PFAS compounds exceed EPA Maximum Contaminant Levels. This is not a current violation — the federal compliance deadline is April 2029 (a proposed extension to 2031 is not final). These are UCMR 5 results from 2023 to 2025; the system may have installed treatment since.
Key contaminants vs MCL
PFOA19.6 ppt(MCL: 4 ppt)
PFOS23 ppt(MCL: 4 ppt)
EPA MCL: 4 ppt (parts per trillion) for PFOA and PFOS individually. Compliance deadline: April 26, 2029 under the current rule.
See this system's PFAS detection levels
Free — enter your email for full site detail and weekly alerts.
See the exact detection levels — free
Your email unlocks every blurred value on this page instantly. You'll also get email updates when your state's MCLs, settlement deadlines, or funding change.
984 more results for this water system — free with your email
See the exact detection levels — free
Your email unlocks every blurred value on this page instantly. You'll also get email updates when your state's MCLs, settlement deadlines, or funding change.
Dates, health-based flags, and resolution status. Pro — 14-day free trial, no card required.
See the exact detection levels — free
Your email unlocks every blurred value on this page instantly. You'll also get email updates when your state's MCLs, settlement deadlines, or funding change.
As printed in the state's own documents. Amounts are not added together: each is a different kind of figure.
Jul 2, 2025 · Northampton Bucks County Municipal Authority Churchville Public Water Project · $13M
Listed for FFY2025 BIL Emerging Contaminants funds in the DWSRF Intended Use Plan. Source →
Apr 23, 2025 · Received a $13,042,732 grant and a $6,876,873 loan for Per- and Polyfluoroalkyl substances (PFAS) remediation projects in Churchville and Hillside Manors. The Authority and the United States Department of the Navy are participating in an Environmental Services Cooperative Agreement (ESCA) related to past activities that created groundwater contamination issues at the former Naval Air Warfare Center (NAWC) Warminster facility which neighbored Northampton Township. Through this project, 334 private properties will be connected to the public water system, contingent on each homeowner’s acceptance of the connection offer. Within the "Churchville Manor Public Water Project", construction will include 9,800 feet of 8-inch ductile iron pipe (DIP) water main, 9 fire hydrants, 19,000 feet of ¾-inch service lines, 160 residential meters, and 160 private interior water connections. Within the "Hillside Manor Public Water Project", 8,100 feet of 8-inch ductile iron pipe (DIP) water main, 9 fire hydrants, 20,000 feet of ¾-inch service lines,174 residential meters, and 174 private interior water connections will be constructed. Each project location will also include the construction of 1 sampling station and 2 flushing stations. The new customers will experience improved water quality with the reduction in exposure to PFAS contamination and the community will also save approximately 20 percent in energy costs with the disconnection of up to 334 private wells, which expend more engery to operate. · —