One or more PFAS compounds exceed EPA Maximum Contaminant Levels. This is not a current violation — the federal compliance deadline is April 2029 (a proposed extension to 2031 is not final). These are UCMR 5 results from 2023 to 2025; the system may have installed treatment since.
Key contaminants vs MCL
PFOA11.4 ppt(MCL: 4 ppt)
PFOS11.5 ppt(MCL: 4 ppt)
EPA MCL: 4 ppt (parts per trillion) for PFOA and PFOS individually. Compliance deadline: April 26, 2029 under the current rule.
See this system's PFAS detection levels
Free — enter your email for full site detail and weekly alerts.
See the exact detection levels — free
Your email unlocks every blurred value on this page instantly. You'll also get email updates when your state's MCLs, settlement deadlines, or funding change.
590 more results for this water system — free with your email
See the exact detection levels — free
Your email unlocks every blurred value on this page instantly. You'll also get email updates when your state's MCLs, settlement deadlines, or funding change.
As printed in the state's own documents. Amounts are not added together: each is a different kind of figure.
Sep 1, 2026 · The project scope is for planning and design engineering costs, including CMAR pre-construction costs, for PFAS upgrades at the existing Myrtle Beach WTP to comply with the final PFAS National Primary Drinking Water Regulation (NPDWR). · $1.5M
On SRF fundable list (Provisional Priority List). Source →
Sep 1, 2026 · The project scope includes construction and associated engineering construction phase services for PFAS upgrades at the Myrtle Beach WTP required to comply with the final PFAS National Primary Drinking Water Regulation (NPDWR). · $16.1M
On SRF fundable list (Provisional Priority List). Source →
Sep 1, 2026 · The project scope is for planning and design engineering costs, including CMAR pre-construction costs, for PFAS upgrades at the existing Bull Creek WTP to comply with the final PFAS National Primary Drinking Water Regulation (NPDWR). · $4.86M
On SRF fundable list (Provisional Priority List). Source →
Jun 26, 2026 · The project scope is for planning and design engineering costs, including CMAR pre-construction costs, for PFAS upgrades at the existing Myrtle Beach WTP to comply with the final PFAS National Primary Drinking Water Regulation (NPDWR). ·
If you need a lab, an engineer, a treatment firm or a funding contact for this system, tell us what the project needs. We'll point you to who may fit.
$425k
On SRF fundable list (Provisional Priority List). Source →
Jun 26, 2026 · The project scope is for planning and design engineering costs, including CMAR pre-construction costs, for PFAS upgrades at the existing Bull Creek WTP to comply with the final PFAS National Primary Drinking Water Regulation (NPDWR). · $2.42M
On SRF fundable list (Provisional Priority List). Source →
Jun 26, 2026 · The project scope is for planning and design engineering costs, including CMAR pre-construction costs, for PFAS upgrades at the existing Bull Creek WTP to comply with the final PFAS National Primary Drinking Water Regulation (NPDWR). · $7.28M
On state DWSRF priority list (requested). Source →
Jun 26, 2026 · The project scope is for planning and design engineering costs, including CMAR pre-construction costs, for PFAS upgrades at the existing Myrtle Beach WTP to comply with the final PFAS National Primary Drinking Water Regulation (NPDWR). · $1.92M
On state DWSRF priority list (requested). Source →
Jun 26, 2026 · The project scope includes construction and associated engineering construction phase services for PFAS upgrades at the Myrtle Beach WTP required to comply with the final PFAS National Primary Drinking Water Regulation (NPDWR). · $16.1M
On state DWSRF priority list (requested). Source →
Jun 26, 2026 · The project scope includes construction and associated engineering construction phase services for PFAS upgrades at the Myrtle Beach WTP required to comply with the final PFAS National Primary Drinking Water Regulation (NPDWR). · $40M
On state DWSRF priority list (requested). Source →