The water systems South Carolina's own documents tie to PFAS funding: what each project is, the amount the state printed, how far it has got, and the document that says so. Latest record Sep 1, 2026; page updated Nov 2, 2026.
Sources: Federal FY 2023 DWSRF Emerging Contaminants Grant Intended Use Plan for State FY 2024 - Fi (2024-06-26); Federal FY 2024 DWSRF Base Capitalization Grant Intended Use Plan for State FY 2025 - Fina (2025-08-06); Federal FY 2024 DWSRF Emerging Contaminants Grant Intended Use Plan for State FY 2025 - Fi (2024-10-22); Federal FY 2024 DWSRF General Supplemental Grant Intended Use Plan for State FY 2025 - Fin (2026-06-26); Federal FY 2025 DWSRF Emerging Contaminants Grant Intended Use Plan for State FY 2026 - Fi (2025-08-06); Federal FY 2026 DWSRF Emerging Contaminants Grant Intended Use Plan for State FY 2027 - Fi (2026-06-26); Federal FY 2026 DWSRF General Supplemental Grant Intended Use Plan for State FY 2027 - Fin (2026-09-01); South Carolina's Comprehensive Priority List of DWSRF Projects (2026-06-26). Open funding rounds and rules for South Carolina →
| Sep 1, 2026 | The project scope is for planning and design engineering costs, including CMAR pre-construction costs, for PFAS upgrades at the existing Myrtle Beach WTP to comply with the final PFAS National Primary Drinking Water Regulation (NPDWR). On SRF fundable list (Provisional Priority List) | $1.5M | Source, p. 20 → |
| Sep 1, 2026 | The project scope includes construction and associated engineering construction phase services for PFAS upgrades at the Myrtle Beach WTP required to comply with the final PFAS National Primary Drinking Water Regulation (NPDWR). On SRF fundable list (Provisional Priority List) | $16.1M | Source, p. 20 → |
| Sep 1, 2026 | The project scope is for planning and design engineering costs, including CMAR pre-construction costs, for PFAS upgrades at the existing Bull Creek WTP to comply with the final PFAS National Primary Drinking Water Regulation (NPDWR). On SRF fundable list (Provisional Priority List) | $4.86M | Source, p. 20 → |
| Jun 26, 2026 | The project scope is for planning and design engineering costs, including CMAR pre-construction costs, for PFAS upgrades at the existing Myrtle Beach WTP to comply with the final PFAS National Primary Drinking Water Regulation (NPDWR). On SRF fundable list (Provisional Priority List) | $425k | Source, p. 16 → |
| Jun 26, 2026 | The project scope is for planning and design engineering costs, including CMAR pre-construction costs, for PFAS upgrades at the existing Bull Creek WTP to comply with the final PFAS National Primary Drinking Water Regulation (NPDWR). On SRF fundable list (Provisional Priority List) | $2.42M | Source, p. 17 → |
| Jun 26, 2026 | The project scope is for planning and design engineering costs, including CMAR pre-construction costs, for PFAS upgrades at the existing Bull Creek WTP to comply with the final PFAS National Primary Drinking Water Regulation (NPDWR). On state DWSRF priority list (requested) | $7.28M | Source, p. 4 → |
| Jun 26, 2026 | The project scope is for planning and design engineering costs, including CMAR pre-construction costs, for PFAS upgrades at the existing Myrtle Beach WTP to comply with the final PFAS National Primary Drinking Water Regulation (NPDWR). On state DWSRF priority list (requested) | $1.92M | Source, p. 4 → |
| Jun 26, 2026 | The project scope includes construction and associated engineering construction phase services for PFAS upgrades at the Myrtle Beach WTP required to comply with the final PFAS National Primary Drinking Water Regulation (NPDWR). On state DWSRF priority list (requested) | $16.1M | Source, p. 4 → |
| Jun 26, 2026 | The project scope includes construction and associated engineering construction phase services for PFAS upgrades at the Myrtle Beach WTP required to comply with the final PFAS National Primary Drinking Water Regulation (NPDWR). On state DWSRF priority list (requested) | $40M | Source, p. 6 → |
| Sep 1, 2026 | This project will include final design, construction document (plans & specifications) preparation, and permitting for the water plant improvements necessary to meet the new EPA regulations on PFAS removal. It will build on the findings of the Treatment Evaluation Study for Emerging Contaminants and the Preliminary Engineering Report, which evaluated the various alternatives to meet these new regulations. On SRF fundable list (Provisional Priority List) | $4.4M | Source, p. 20 → |
| Jun 26, 2026 | This project will include final design, construction document (plans & specifications) preparation, and permitting for the water plant improvements necessary to meet the new EPA regulations on PFAS removal. It will build on the findings of the Treatment Evaluation Study for Emerging Contaminants and the Preliminary Engineering Report, which evaluated the various alternatives to meet these new regulations. On SRF fundable list (Provisional Priority List) | $1.6M | Source, p. 16 → |
| Jun 26, 2026 | This project will include final design, construction document (plans & specifications) preparation, and permitting for the water plant improvements necessary to meet the new EPA regulations on PFAS removal. It will build on the findings of the Treatment Evaluation Study for Emerging Contaminants and the Preliminary Engineering Report, which evaluated the various alternatives to meet these new regulations. On state DWSRF priority list (requested) | $6M | Source, p. 4 → |
| Jun 26, 2026 | Permanently mounted diesel generators at all six (6) groundwater wells. On state DWSRF priority list (requested) | $485k | Source, p. 8 → |
| Aug 6, 2025 | scope of this project is to use the findings of the Treatment Evaluation Study for Emerging Contaminants, which has determined process treatment methods capable of addressing emerging contaminant removal from the source water based on bench scale treatability analysis, to move forward with the Preliminary Engineering Report (PER) which will evaluate the various alternatives to meet the new EPA regulatons for PFAS in the National Primary Drinking Water Regulations. This project will include a PER meeting all requirements of DWSRF. This PER will evaluate in detail the various alternatives such as existing water plant upgrades, a new advanced water treatment facility, and other water supply sources to determine the best course of action. On SRF fundable list (Provisional Priority List) | $485k | Source, p. 16 → |
| Oct 22, 2024 | The scope of this project is to retain the services of an Engineering Consultant to perform an evaluation of the W.R. Wise Treatment Plant's ability and method to treat emerging contaminants. In particular, we will be determining the improvements that will be necessary to treat PFAS. The SCDHEC Ambient Surface Water Project shows PFAS levels in Lake Greenwood (water source for W.R. Wise Water Treatment Plant) above the MCLs proposed by EPA in the proposed PFAS National Primary Drinking Water Regulations. If EPA finalizes these regulations at the proposed levels, additional treatment process will be required at the W.R. Wise Water Treatment Plant to remove PFAS to the levels proposed in the MCL. This project will include preliminary analysis, testing, process evaluations, preliminary engineering reports, and others studies required to determine the best course of action to meet the required levels. On SRF fundable list (Provisional Priority List) | $200k | Source, p. 17 → |
| Jun 26, 2026 | The PFAS treatment project would install post-filter adsorption treatment technology at the Purrysburg WTP. The project would consist of a dedicated new building and would house the media contactors and related equipment required such as influent and backwash pumps, media delivery and storage facilities, cartridge filters, associated piping and valves, necessary chemical feed and storage monitoring equipment, and backwash water storage. The new building would include HVAC, electrical and other utilities. Additional project costs include the initial granular activated carbon media fill for the post-filter adsorption technology. The size of the improvements would be scaled to the Purrysburg WTP which will be rated to treat up to 30 million gallons per day. On state DWSRF priority list (requested) | $55.2M | Source, p. 8 → |
| Jun 26, 2026 | BJWSA is preparing to implement a PFAS treatment project to meet the upcoming proposed US Environmental Protection Agency National Primary Drinking Water Regulation. The PFAS treatment project would install post-filter adsorption treatment technology at the Chelsea WTP. The project would consist of a dedicated new building and would house the media contactors and related equipment required such as influent and backwash pumps, media delivery and storage facilities, cartridge filters, associated piping and valves, necessary chemical feed and storage monitoring equipment, and backwash water storage. The new building would include HVAC, electrical and other utilities. Additional project costs include the initial granular activated carbon media fill for the post-filter adsorption technology. The size of the improvements would be scaled to the Chelsea WTP which is rated to treat up to 24 million gallons per day. On state DWSRF priority list (requested) | $57.3M | Source, p. 8 → |
| Aug 6, 2025 | This project includes planning and design engineering services and some pilot testing for a dedicated new building that would house the media contactors and related equipment required such as influent and backwash pumps, media delivery and storage facilities, cartridge filters, associated piping and valves, necessary chemical feed and storage monitoring equipment, and backwash water storage to treat PFAS. On SRF fundable list (Provisional Priority List) | $3.15M | Source, p. 19 → |
| Aug 6, 2025 | This project includes planning and design engineering services and some pilot testing for a PFAS treatment project that would install post-filter adsorption treatment technology at the Purrysburg WTP. The project would consist of a dedicated new building and would house the media contactors and related equipment required such as influent and backwash pumps, media delivery and storage facilities, cartridge filters, associated piping and valves, necessary chemical feed and storage monitoring equipment, and backwash water storage. On SRF fundable list (Provisional Priority List) | $3.38M | Source, p. 19 → |
| Oct 22, 2024 | This project includes planning and design engineering services and some pilot testing for a dedicated new building that would house the media contactors and related equipment required such as influent and backwash pumps, media delivery and storage facilities, cartridge filters, associated piping and valves, necessary chemical feed and storage monitoring equipment, and backwash water storage to treat PFAS. On SRF fundable list (Provisional Priority List) | $2.58M | Source, p. 18 → |
| Jun 26, 2024 | This project includes planning and design engineering services and some pilot testing for a PFAS treatment project that would install post-filter adsorption treatment technology at the Purrysburg WTP. The project would consist of a dedicated new building and would house the media contactors and related equipment required such as influent and backwash pumps, media delivery and storage facilities, cartridge filters, associated piping and valves, necessary chemical feed and storage monitoring equipment, and backwash water storage. On SRF fundable list (Provisional Priority List) | $2.14M | Source, p. 14 → |
| Jun 26, 2026 | This project includes upgrades to the water treatment plant to improve treatment performance and remove emerging contaminants (PFAS). On state DWSRF priority list (requested) | $7.8M | Source, p. 3 → |
| Jun 26, 2024 | This project includes upgrades to the water treatment plant to improve treatment performance and remove emerging contaminants (PFAS). On SRF fundable list (Provisional Priority List) | $1.7M | Source, p. 14 → |
| Jun 26, 2026 | The proposed project will include an evaluation of the various treatment options that are known to remove PFAS. This includes advanced treatment options such as Powdered Activated Carbon (PAC), Granular Activated Carbon (GAC), Anion Exchange (AIX), and Reverse Osmosis/Nanofiltration (RO/NF), at a minimum. The study will involve research and bench scale testing to determine the efficiency of PFAS removal for each treatment option. On SRF fundable list (Provisional Priority List) | $725k | Source, p. 17 → |
| Jun 26, 2026 | The proposed project will include an evaluation of the various treatment options that are known to remove PFAS. This includes advanced treatment options such as Powdered Activated Carbon (PAC), Granular Activated Carbon (GAC), Anion Exchange (AIX), and Reverse Osmosis/Nanofiltration (RO/NF), at a minimum. The study will involve research and bench scale testing to determine the efficiency of PFAS removal for each treatment option. On state DWSRF priority list (requested) | $725k | Source, p. 7 → |
| Jun 26, 2026 | CWS recently completed bench-scale and full-scale testing of powdered activated carbon (PAC) to identify improvements necessary for PFAS treatment as part of the Charleston Water System PFAS Study. Based on the study findings, CWS plans to move forward with the initial Phase 1 improvements, including detailed design of a properly sized PAC Storage and Feed Facility to ensure compliance with finalized USEPA National Primary Drinking Water Regulation (NPDWR) as well as SCDES SPDWR requirements for surface water treatment facility design. The project will include detailed design services for a new PAC system with four (4) silos and eight (8) feeders, providing a minimum of thirty (30) days of PAC storage under average flow and design dose conditions and sufficient metering capacity to meet HWTP design flows. On SRF fundable list (Provisional Priority List) | $1.5M | Source, p. 16 → |
| Jun 26, 2026 | CWS recently completed bench-scale and full-scale testing of powdered activated carbon (PAC) to identify improvements necessary for PFAS treatment as part of the Charleston Water System PFAS Study. Based on the study findings, CWS plans to move forward with the initial Phase 1 improvements, including detailed design of a properly sized PAC Storage and Feed Facility to ensure compliance with finalized USEPA National Primary Drinking Water Regulation (NPDWR) as well as SCDES SPDWR requirements for surface water treatment facility design. The project will include detailed design services for a new PAC system with four (4) silos and eight (8) feeders, providing a minimum of thirty (30) days of PAC storage under average flow and design dose conditions and sufficient metering capacity to meet HWTP design flows. On state DWSRF priority list (requested) | $1.5M | Source, p. 4 → |
| Oct 22, 2024 | The HWTP is planning a PFAS treatment project to meet the recently-released USEPA PFAS regulations. Several Powdered Activated Carbon (PAC) products will be evaluated and testing results will be analyzed to provide a basis of design for the full scale plant. The study will involve bench-scale testing for powdered activated carbon (PAC) to determine the most suitable product, dose, and contact time for PFAS treatment at the HWTP. In addition, the bench-scale testing protocol will also include analyses to evaluate the effects of PAC on other source water characteristics (e.g., total organic carbon (TOC), pH, alkalinity, etc.), as well as effects on water treatability based on the existing/planned HWTP unit processes. Based on the results of the study, a Preliminary Engineering Report (PER) for the PFAS treatment project will be developed. On SRF fundable list (Provisional Priority List) | $650k | Source, p. 21 → |
| Jun 26, 2026 | Conduct a pilot study to test a proposed PFAS Treatment System that is much more financially feasible to operate than a traditional GAC System. On state DWSRF priority list (requested) | $150k | Source, p. 3 → |
| Aug 6, 2025 | Conduct a pilot study to test a proposed PFAS Treatment System that is much more financially feasible to operate than a traditional GAC System. On SRF fundable list (Provisional Priority List) | $150k | Source, p. 15 → |
| Jun 26, 2026 | As part of ongoing, preliminary bench-scale studies conducted at both plants (Phase I), this project focuses on further bench- scale evaluation by Rapid Small-Scale Column Tests (RSSCTs) for Lake Murray water treatment plant and pilot-scale testing for Reverse Osmosis and Granular Activated Carbon treatment technologies at both water treatment plants. On state DWSRF priority list (requested) | $1.71M | Source, p. 6 → |
| Aug 6, 2025 | As part of ongoing, preliminary bench-scale studies conducted at both plants (Phase I), this project focuses on further bench- scale evaluation by Rapid Small-Scale Column Tests (RSSCTs) for Lake Murray water treatment plant and pilot-scale testing for Reverse Osmosis and Granular Activated Carbon treatment technologies at both water treatment plants. On SRF fundable list (Provisional Priority List) | $1.71M | Source, p. 16 → |
| Jun 26, 2026 | This project is intended to continue the current study/pilot phase of this project which is currently SRF Project No. 2110001-06 Pee Dee Regional WTP - Advanced PFAS Treatment Study. This current Project Questionnaire is to advance the project to Final Design and preparation of construction drawings and specifications. On state DWSRF priority list (requested) | $4M | Source, p. 7 → |
| Aug 6, 2025 | This project is intended to continue the current study/pilot phase of this project which is currently SRF Project No. 2110001-06 Pee Dee Regional WTP - Advanced PFAS Treatment Study. This current Project Questionnaire is to advance the project to Final Design and preparation of construction drawings and specifications. On SRF fundable list (Provisional Priority List) | $2.5M | Source, p. 19 → |
| Oct 22, 2024 | This project is intended to continue the current study/pilot phase of this project which is currently SRF Project No. 2110001-06 Pee Dee Regional WTP - Advanced PFAS Treatment Study. This current Project Questionnaire is to advance the project to Final Design and preparation of construction drawings and specifications. On SRF fundable list (Provisional Priority List) | $1.5M | Source, p. 18 → |
| Jun 26, 2024 | A study, and subsequent pilot testing, will be conducted to determine which process is recommended for the Pee Dee WTP. This study will involve pilot testing one or more of the technologies. This would allow the City to make informed choices during the design of the current expansion to enable integration of any advanced PFAS treatment process (e.g., placement of tees with blind flanges in yard piping, allocation of appropriate space). This would also allow the City to determine a cost-effective phased plan of improvements to comply with upcoming PFAS and other emerging contaminant regulations. On SRF fundable list (Provisional Priority List) | $500k | Source, p. 14 → |
| Jun 26, 2026 | A PER will be developed to evaluate and compare PFAS treatment technologies using representative source water under controlled conditions. The raw water PFAS compound distribution, TOC, and other parameters that influence treatment performance will be determined followed by bench-scale and pilot- scale testing to simulate full-scale operation of candidate media such as granular activated carbon or ion exchange. Test results are used to assess PFAS removal efficiency, breakthrough behavior, and sensitivity to competing constituents. Findings from the bench/pilot testing will be documented in a PER which summarizes quality conditions, testing methods, analytical results, and a comparative evaluation of treatment alternatives, including life-cycle cost, operational considerations, and residual management. The PER will provide a defensible technical basis for selecting a recommended treatment approach and define next steps. On SRF fundable list (Provisional Priority List) | $738k | Source, p. 16 → |
| Jun 26, 2026 | A PER will be developed to evaluate and compare PFAS treatment technologies using representative source water under controlled conditions. The raw water PFAS compound distribution, TOC, and other parameters that influence treatment performance will be determined followed by bench-scale and pilot-scale testing to simulate full-scale operation of candidate media such as granular activated carbon or ion exchange. Test results are used to assess PFAS removal efficiency, breakthrough behavior, and sensitivity to competing constituents. Findings from the bench/pilot testing will be documented in a PER which summarizes quality conditions, testing methods, analytical results, and a comparative evaluation of treatment alternatives, including life-cycle cost, operational considerations, and residual management. The PER will provide a defensible technical basis for selecting a recommended treatment approach and define next steps. On state DWSRF priority list (requested) | $738k | Source, p. 5 → |
| Jun 26, 2026 | This project includes the design and construction of a new well and treatment system to provide quality drinking water to the district's existing customers and potential customers that are on individual wells that are likely to be contaminated with Radium and PFAS. The well will be a 10 inch well providing 300 gpm with associated piping and treatment to properly disinfect the well water and remove radium from the water. On SRF fundable list (Provisional Priority List) | $1.5M | Source, p. 19 → |
| Jun 26, 2026 | The project will include the extension of approximately 4900 LF of ten-inch, 1300 LF of six-inch, 700 LF of four-inch water main and associated appurtenances to private well sewers with elevated ground water levels of PFAS. This project will provide the residents in the area with a reliable, safe drinking water source. On state DWSRF priority list (requested) | $2.06M | Source, p. 9 → |
| Aug 6, 2025 | The project will include the extension of approximately 4900 LF of ten-inch, 1300 LF of six-inch, 700 LF of four-inch water main and associated appurtenances to private well sewers with elevated ground water levels of PFAS. This project will provide the residents in the area with a reliable, safe drinking water source. On SRF fundable list (Provisional Priority List) | $2.06M | Source, p. 17 → |
| Jun 26, 2026 | The Pineview Water Line Extension will provide residents with PFAS contaminated private wells access to safe and reliable public drinking water. The project will consist of approximately 5,370 linear feet of new 8-inch and 6-inch water main, including the installation of fire hydrants and necessary road crossings. This water system extension will provide municipal drinking water to 31 residential properties located in Pineview Estates. On SRF fundable list (Provisional Priority List) | $800k | Source, p. 17 → |
| Jun 26, 2026 | The Pineview Water Line Extension will provide residents with PFAS contaminated private wells access to safe and reliable public drinking water. The project will consist of approximately 5,370 linear feet of new 8-inch and 6-inch water main, including the installation of fire hydrants and necessary road crossings. This water system extension will provide municipal drinking water to 31 residential properties located in Pineview Estates. On state DWSRF priority list (requested) | $800k | Source, p. 5 → |
| Jun 26, 2026 | The project would consist of drilling and development of a new groundwater well to provide additional capacity for the water company. The new well would also replace capacity being lost from an existing well on Gainey Avenue which has elevated concentrations of PFAS. On SRF fundable list (Provisional Priority List) | $300k | Source, p. 19 → |
| Jun 26, 2026 | The scope this project includes a pilot study evaluation of various treatment technologies to assess their ability to meet the current regulatory requirements for PFAS at WRWD. Technologies under consideration include reverse osmosis, granular activated carbon, anion exchange, Fluorosorb, powdered activated carbon, and foam fractionation. The purpose of this PFAS treatment alternatives study is to evaluate performance and conceptually size potential advanced water treatment technologies to remove PFAS compounds and comply with MCLs as well as evaluate impacts to current WTP operations and water quality. On SRF fundable list (Provisional Priority List) | $1.2M | Source, p. 16 → |
| Jun 26, 2026 | The scope this project includes a pilot study evaluation of various treatment technologies to assess their ability to meet the current regulatory requirements for PFAS at WRWD. Technologies under consideration include reverse osmosis, granular activated carbon, anion exchange, Fluorosorb, powdered activated carbon, and foam fractionation. The purpose of this PFAS treatment alternatives study is to evaluate performance and conceptually size potential advanced water treatment technologies to remove PFAS compounds and comply with MCLs as well as evaluate impacts to current WTP operations and water quality. On state DWSRF priority list (requested) | $1.2M | Source, p. 5 → |
| Oct 22, 2024 | The WRWD WTP treats raw water from the North Tyger River and the South Tyger River. PFAS level in the raw water have been found to be greater than the MCL proposed by the EPA. Testing of finished water in WRWD's distribution system has shown similar PFAS levels, suggesting that the existing treatment process is not removing PFAS in any significant way. WRWD also maintains distribution system interconnections with Spartanburg Water and the SJWD Water District. The project scope includes planning and design of distribution system improvements to provide a 12-inch interconnection with the SJWD system in order to provide redundancy to the overall WRWD system. To date, SJWD reports no PFAS in their raw or finished water. On SRF fundable list (Provisional Priority List) | $100k | Source, p. 19 → |
| Oct 22, 2024 | The project scope includes retaining the services of a consulting engineer (Garver) to perform an evaluation of the WRWD WTP's to determine treatment process changes required to remove PFAS. The WRWD WTP treats raw water from the North Tyger River and the South Tyger River. PFAS level in the raw water have been found to be greater than the MCL proposed by the EPA. Testing of finished water in WRWD's distribution system has shown similar PFAS levels, suggesting that the existing treatment process is not removing PFAS in any significant way. On SRF fundable list (Provisional Priority List) | $100k | Source, p. 20 → |
| Aug 6, 2025 | The Raw Water Pilot Study will be conducted in multiple phases to ensure a comprehensive evaluation of PFAS contamination and treatment options. The first phase will involve an extensive data collection effort, where raw water samples will be taken from the raw water intake point at Lake Paul Wallace and analyzed for various PFAS compounds, including PFOA, PFOS, GenX, and other emerging contaminants. Additionally, other water quality parameters such as pH, turbidity, and organic matter content will be assessed to determine their impact. On SRF fundable list (Provisional Priority List) | $325k | Source, p. 15 → |
| Aug 6, 2025 | Waccamaw Neck WTP is planning a best available treatment technology to meet the recently-released USEPA PFAS regulations. Our most current PFAS sampling results is trending downward. The proposed project will include an increase sampling plan and evaluation of the various treatment options to meet the current MCL limits for PFAS. PFAS capture technologies such as GAC, ion exchange resin, Nano-filtration, foam fractionation, and/or PFAS destruction methods will be evaluated and testing results will be analyzed to provide a basis of design for the full scale plant. The requirements of the proposed technologies will be studied with respect to effectiveness, infrastructure needs, costs, and compatibility with future PFAS treatment technologies. A bench-scale testing will be performed to determine the most suitable technology for PFAS removal at the Waccamaw Neck WTP. The bench-scale testing will also include analyses to evaluate the effectiveness of total organic carbon (TOC) reduction, need for pH adjustment, and alkalinity concentration. Based on the results of the study, a Preliminary Engineering Report (PER) for the PFAS treatment project will be developed. On SRF fundable list (Provisional Priority List) | $700k | Source, p. 16 → |
| Aug 6, 2025 | An evaluation of treatment options for emerging contaminants, specifically PFAS, as well as an operational evaluation of the existing treatment plant. Bench-scale testing of powdered activated carbon (PAC) products for PFAS removal will be conducted. This testing will provide insight on the effectiveness of PAC for PFAS treatment. In addition, rapid small scale column tests (RSSCT) will be performed on one or more granular activated carbon (GAC) / ion exchange (IX) / alternative media options. This will provide information on the preferred option for post-filtration PFAS treatment. On SRF fundable list (Provisional Priority List) | $287k | Source, p. 17 → |
| Aug 6, 2025 | This is an engineering planning and design project for the Lake Murray WTP PFAS Removal Facilities to add granular activated carbon (GAC) to NCWSA’s existing WTP following filtration to remove PFAS contaminants regulated under the Environmental Protection Agency’s (EPA) recently enacted PFAS Regulation. The new facilities will include two GAC trains (for redundancy and peak day flows) of two GAC pressure vessels per train. In addition to engineering design of PFAS Removal Facilities, a GAC pilot-scale study will be conducted as a product selection tool for the type of GAC media to be used for treatment. On SRF fundable list (Provisional Priority List) | $1.2M | Source, p. 15 → |
| Oct 22, 2024 | The project will include an evaluation of treatment options for emerging contaminants, specifically PFAS. Bench-scale testing of powdered activated carbon (PAC) products for PFAS removal will be conducted. In addition, desktop modeling of granular activated carbon (GAC)/ion exchange (IX)/Fluorosorb will be conducted to determine the most promising options for PFAS removal. Rapid small scale column tests (RSSCT) will be performed on the most promising options. On SRF fundable list (Provisional Priority List) | $265k | Source, p. 16 → |
| Aug 6, 2025 | This project is an engineering planning and design project for PFAS removal at the City of Newberry's WTP. The PFAS treatment system will be designed to treat 8.1 MGD from the City's WTP. Planning activities include an evaluation of PFAS removal technologies to select up to three (3) suitable technologies for pilot testing (based on performance and expected operating costs), development and execution of pilot testing for the selected technologies, and preparation of a pilot test report documenting the tests and recommending an alternative for full-scale implementation. Design activities include preparation of a PER suitable for technical and funding agency approval and design and permitting of the recommended system in anticipation that separate construction funds will be secured by the City. On SRF fundable list (Provisional Priority List) | $1.5M | Source, p. 17 → |
| Aug 6, 2025 | The scope of this project is to retain the services of an Engineering Consultant to perform an evaluation of the SCWSA Water Treatment Plant's ability and method to treat emerging contaminants. In particular, we will be determining the improvements that will be necessary to treat PFAS & PFOA. SCWSA and UCMR 5 sampling data shows PFAS & PFOA levels in the water source for SCWCA WTP above the EPA's MCLs for PFAS & PFOA in the National Primary Drinking Water Regulations. Additional treatment process will be required at the Water Treatment Plant to remove PFAS & PFOA to the levels proposed in the MCL. This project will include preliminary analysis, testing, process evaluations, engineering reports, and others studies required to determine the best course of action to meet the required levels. On SRF fundable list (Provisional Priority List) | $350k | Source, p. 15 → |
| Aug 6, 2025 | Sampling data has shown that the PFOS and PFOA levels in the source water for the Lake Marion Regional Water System are above the new EPA limits. A PFAS treatment study has been completed for this facility in order to evaluate known treatment options. The next step in determining the best treatment option is to conduct bench-scale testing to further evaluate the performance of Granular Activated Carbon (GAC) and Ion Exchange (IX) for removing PFAS from the source water. On SRF fundable list (Provisional Priority List) | $74k | Source, p. 15 → |
| Oct 22, 2024 | Sampling data has shown that the PFOS and PFOA levels in the source water for the Lake Marion Regional Water System are above the new EPA limits. A PFAS treatment study has been completed for this facility in order to evaluate known treatment options. The next step in determining the best treatment option is to conduct bench-scale testing to further evaluate the performance of Granular Activated Carbon (GAC) and Ion Exchange (IX) for removing PFAS from the source water. On SRF fundable list (Provisional Priority List) | $77k | Source, p. 16 → |
| Aug 6, 2025 | Generally the project includes upgrading the facilities 6 dual media gravity filters with new underdrains, cemetious wall coatings, and granular activated carbon. Work will replace aging Leopold underdrains with new restrain compatible blocks and media retainers while adding granular activated carbon to address EPA's proposed MCL's for PFAS. On SRF fundable list (Provisional Priority List) | $1.61M | Source, p. 16 → |
| Oct 22, 2024 | Primary focus of this project is to identify an optimal technology that will be implemented at both of our water treatment facilities to address PFAS related compounds in our source waters. Our current approach utilizes MCL proposals from EPA, and a draft timeline for implementation. Such low limits and quick implementation of an MCL has forced am accelerated response to address a proposed MCL. Consequences included implementation of a technology that will work, but may not be optimal from an operation and maintenance perspective nor an efficient use of rate payer dollars. Ultimately, a detailed evaluation focused on both PFAS compounds outlined in the proposed MCL along with their precursors will benefit public health by identifying optimal removal and destruction technologies specific to our source water and treatment approaches. On SRF fundable list (Provisional Priority List) | $325k | Source, p. 20 → |
| Jun 26, 2024 | Generally the project includes upgrading the facilities 6 dual media gravity filters with new underdrains, cemetious wall coatings, and granular activated carbon. Work will replace aging Leopold underdrains with new restrain compatible blocks and media retainers while adding granular activated carbon to address EPA's proposed MCL's for PFAS. On SRF fundable list (Provisional Priority List) | $3.2M | Source, p. 14 → |
| Oct 22, 2024 | The proposed project will include an evaluation of the various treatment options that are known to remove PFAS. This includes advanced treatment options such as Granular Activated Carbon (GAC), Anion Exchange (AIX), and Reverse Osmosis (RO)/Nanofiltration (NF), at a minimum. In addition, benefits of feeding increased dosages of Powdered Activated Carbon (PAC) will be evaluated. The study will involve research and bench scale testing to determine the efficiency of PFAS removal for each option. In addition, the study will evaluate which of these treatments, or combination of treatment, is also capable of treating MIB and Geosmin, which would be an added benefit to ensure the City is capable of treating the water to minimize taste and odor concerns during future algal blooms. This will include a review of theefficiency, required footprint, upfront capital costs, maintenance costs, residuals/solids handling, ease of operation, and long-term impacts. On SRF fundable list (Provisional Priority List) | $600k | Source, p. 19 → |
| Oct 22, 2024 | The proposed study will include testing of both raw water sources for precursors included in the approved EPA 1633 method as well as EPA 533. The testing will include both raw and finished water as well as levels at different stages of treatment to assist with determining future PFAS treatment in addition to determining which step the proposed technology would be included. PFAS capture technologies such as GAC and ion exchange resin or membranes such as RO and nanofiltration as well as PFAS destruction such as those selected from supercritical water oxidation, electrochemical oxidation and incineration will be evaluated. The requirements of the proposed technologies will be studied with respect to efficacy, infrastructure needs, costs, and compatibility with future PFAS treatment technologies. The study will include a survey of the current and future facility, permitting requirements, design options, and other environmental factors. On SRF fundable list (Provisional Priority List) | $300k | Source, p. 16 → |
| Oct 22, 2024 | This project is an engineering planning and design project for PFAS removal at GBPW's clearwell/high service pump complex. The PFAS treatment system will be designed to treat 18 MGD from GBPW's two WTPs. Planning activities include an evaluation of PFAS removal technologies to select up to two (2) suitable technologies for pilot testing (based on performance and expected operating costs), development and execution of pilot testing for the selected technologies, and preparation of a pilot test report documenting the tests and recommending an alternative for full-scale implementation. Design activities include preparation of a PER suitable for technical and funding agency approval and design and permitting of the recommended system in anticipation that separate construction funds will be secured by GBPW. On SRF fundable list (Provisional Priority List) | $1.25M | Source, p. 18 → |
| Oct 22, 2024 | The scope of this project is to retain the services of Garver to perform an evaluation of the Greer CPW WTP 's ability and methodology to treat emerging emerging contaminants. In particular the improvements that will be necessary to treat PFAS. The SCDHEC Ambient Surface Water Project as well as supplemental sampling shows PFAS levels in the surrounding area approaching MCLs proposed/discussed by EPA in the proposed PFAS National PDWR. If EPA finalizes these regulations at the proposed/discussed levels, additional treatment process could be required at the WTP. This project will include preliminary analysis, testing, process evaluations, preliminary engineering reports, and others studies required to determine the best course of action to meet the required levels. On SRF fundable list (Provisional Priority List) | $200k | Source, p. 17 → |
| Oct 22, 2024 | The scope of this project is to retain the services of Garver to perform an evaluation of the N. Pacolet WTP 's ability and methodology to treat emerging emerging contaminants. In particular the improvements that will be necessary to treat PFAS. The SCDHEC Ambient Surface Water Project shows PFAS levels in the surrounding area approaching MCLs proposed by EPA in the proposed PFAS National PDWR. If EPA finalizes these regulations at the proposed/discussed levels, additional treatment process could be required at the WTP. This project will include preliminary analysis, testing, process evaluations, preliminary engineering reports, and others studies required to determine the best course of action to meet the required levels. It is important to note that this WTP is currently under construction with a scheduled completion date of June 2026. Therefore, the timing of this study provides an opportunity to positively impact ultimate facility construction. On SRF fundable list (Provisional Priority List) | $200k | Source, p. 17 → |
| Oct 22, 2024 | LEWA will conduct an evaluation of PFAS treatment technologies to include testing on both raw and finished water as well as levels at different stages of treatment to assist with determining future PFAS treatment and which step the proposed technology would be included. Proposed technologies will be studied with respect to efficacy, infrastructure needs, costs, and compatibility with future PFAS treatment technologies. This evaluation will be used to incorporate PFAS treatment into a planned plant expansion from 6 MGD to 12 MGD. On SRF fundable list (Provisional Priority List) | $300k | Source, p. 16 → |
| Oct 22, 2024 | An initial desktop evaluation demonstrated that a new adsorptive contactor PFAS treatment facility to treat the full capacity of the drinking WTP would cost $55M to $64M. However, there may be more cost-effective ways to comply with the regulation. This project is focused on confirming that existing historical PFAS monitoring data is sufficient for design- making purposes, optimizing the costs associated with the preliminary desktop study, and exploring alternative compliance routes. Alternative compliance routes will include alternative or supplementary water sources, PAC adsorption, and designing PFAS treatment for a fraction of the total design demand. Each alternative will be evaluated with respect to their feasibility, complexity, impact to WTP operations, and cost. The outcome of the project will be to identify the alternative that is most effective for ODPU, and prepare a PER. On SRF fundable list (Provisional Priority List) | $500k | Source, p. 20 → |
| Oct 22, 2024 | Sampling data has shown that the PFOS and PFOA levels in the source water for the Lake Moultrie Regional Water System are above the new EPA limits. A PFAS treatment study has been completed for this facility in order to evaluate known treatment options. The next step in determining the best treatment option is to conduct bench-scale testing to further evaluate the performance of Granular Activated Carbon (GAC) and to conduct pilot scale testing of Power Activated Carbon (PAC) for removing PFAS from the source water. On SRF fundable list (Provisional Priority List) | $265k | Source, p. 21 → |
| Oct 22, 2024 | Perform an assessment of groundwater resources in the Starr- Iva service area to identify up to 6 "favorable zones" with the greatest potential for significant groundwater yields and conduct subsequent geophysical surveys to identify drill sites for up to four (4) test wells to be completed in accordance with DHEC standards. The new test wells and a number of existing drinking water wells throughout the District would also be sampled to analyze the quality of the groundwater including emerging contaminants such as per- and polyfluoroalkyl substances ("PFAS") in order to notify and plan for opportunities to serve homeowners with private wells found to be contaminated. On SRF fundable list (Provisional Priority List) | $600k | Source, p. 19 → |
| Oct 22, 2024 | This project is an engineering planning and design project for PFAS removal at the 10.4 MGD Union WTP. Planning activities include an evaluation of PFAS removal technologies to select up to two (2) suitable technologies for pilot testing for the selected technologies, preparation of a pilot test report documenting the tests, and recommendation of an alternative for full-scale implementation. Design activities include preparation of a PER suitable for technical and funding agency approval and design and permitting of the recommended system in anticipation that separate construction funds will be secured by the City. On SRF fundable list (Provisional Priority List) | $1.25M | Source, p. 18 → |
| Jun 26, 2024 | The existing source for the Town of Batesburg-Leesville has PFOS and PFOA levels above the proposed regulatory limits according to sampling performed in 2020. The source from JMWSC (West Columbia Lake Murray WTP) has PFOS and PFOA levels that are lower. On SRF fundable list (Provisional Priority List) | $4.25M | Source, p. 14 → |