One or more PFAS compounds exceed EPA Maximum Contaminant Levels. This is not a current violation — the federal compliance deadline is April 2029 (a proposed extension to 2031 is not final). These are UCMR 5 results from 2023 to 2025; the system may have installed treatment since.
Key contaminants vs MCL
PFOA8 ppt(MCL: 4 ppt)
PFOS8.1 ppt(MCL: 4 ppt)
EPA MCL: 4 ppt (parts per trillion) for PFOA and PFOS individually. Compliance deadline: April 26, 2029 under the current rule.
See this system's PFAS detection levels
Free — enter your email for full site detail and weekly alerts.
See the exact detection levels — free
Your email unlocks every blurred value on this page instantly. You'll also get email updates when your state's MCLs, settlement deadlines, or funding change.
110 more results for this water system — free with your email
See the exact detection levels — free
Your email unlocks every blurred value on this page instantly. You'll also get email updates when your state's MCLs, settlement deadlines, or funding change.
As printed in the state's own documents. Amounts are not added together: each is a different kind of figure.
Oct 22, 2024 · The proposed study will include testing of both raw water sources for precursors included in the approved EPA 1633 method as well as EPA 533. The testing will include both raw and finished water as well as levels at different stages of treatment to assist with determining future PFAS treatment in addition to determining which step the proposed technology would be included. PFAS capture technologies such as GAC and ion exchange resin or membranes such as RO and nanofiltration as well as PFAS destruction such as those selected from supercritical water oxidation, electrochemical oxidation and incineration will be evaluated. The requirements of the proposed technologies will be studied with respect to efficacy, infrastructure needs, costs, and compatibility with future PFAS treatment technologies. The study will include a survey of the current and future facility, permitting requirements, design options, and other environmental factors. · $300k
On SRF fundable list (Provisional Priority List). Source →